PLTM Cianten 1B

tamaris_hidro

Mulai beroperasi
25 April 2016

Lokasi
Desa Cibunian, Kecamatan Pamijahan , Kabupaten Bogor, Provinsi Jawa Barat

Status
Operasi

Spesifikasi Proyek

Kapasitas

6,2

Mega Watt
Head

97

Meter
Debit Air

7.60

Meter ³/s
Waterway

1755,70

Meter
Penstock Steel

356

Meter
Diameter Penstock

1,8

Meter
The largest mini-hydro powerplant player to energize the nation and have a mission to save the earth